• Home
  • About Us
    • Company History Internet Sales Chart of Kosun Quality Certification About KOSUN
  • Products
    • Solids Control Equipment Solids Control System Product Parts Safety Equipment Drilling Waste Management Camp
  • Services
    • OEM Manufacturing Equipment Maintenance Equipment Leasing
  • Cases
  • News
    • Group News Industry News Media Reports
  • Contact Us
首页 > News > Industry News

Use and maintenance of solids control equipment for drilling fluid


 In petroleum operation, solids control system is essential. So, how to use and maintain the solids control equipment? In drilling fluid solids control equipment, there are five levels of solid control purification system, what are these five levels of purification system? Primary purification: shake shaker; Secondary purification: vacuum degasser; Three-stage purification: desander; Four-stage purification: desilter; Level 5 purification: decanter centrifuge.

 

After the drilling mud solid control system arrives at the site, the user shall place, connect, install and support the system according to the site conditions. After the user has connected the equipment to the slurry outlet of the rig bracket, a mud tank or mud pool must be provided to store more mud in order to provide enough drilling fluid for the rig. Each supporting equipment uses separate start and shut down each other's interference. It should be noted that when mixing funnel is used, the feeding butterfly valve should be closed first, and the feeding butterfly valve should be turned over to stop the feeding operation after the pressure drilling fluid is normally discharged from the outlet.


When the drilling fluid shale shaker is discontinued, rinse immediately with clean water. Before starting the mud agitator, check whether there is enough smooth oil in the reducer and add it according to the rules.

 

KOSUN- China Solids Control Leader&Drilling Waste Management Expert

Email: sales2@adkosun.com

Wechat:+86 18792396268

Contact person: Lily Wang

Online consulting:

http://www.kosun.com

http://www.kosuneco.com

Any question or support, please fill in the form below,we will get back to you as soon as possible!!

  • The last: 
  • Subway Muck treatment solution-KOSUN
  • The next: 
  • The Main Equipment of KOSUN Drilling Solids Control System

Industry News

  • Group News
  • Industry News
  • Media Reports

PRODUCTS

Solids Control Equipment

  • Submersible Slurry pump
  • Mud Gun
  • Mud Agitator
  • KOSUN BEM shaker
  • Drilling Fluid Shale Shaker
  • Desilter
  • Centrifugal Pump
  • Jet Mud Mixer
  • Vacuum Degasser
  • Shear Pump
  • Mud Cleaner
  • Decanter Centrifuge
  • Desander
  • Water Tank
  • Diesel Tank
  • Mud Tank

Solids Control System

  • Arctic Solids Control System
  • Mobile Solids Control System
  • Skid-mounted Solids Control System

Drilling Waste Management

  • Hi-G Dryer
  • Screw Pump
  • Screw Conveyer
  • Vertical Centrifuge

Safety Equipment

  • Ignition Device
  • Mud/Gas Separator

Drilling Rig

  • Cone
  • Shaker Spring
  • Screen
  • Electric Control System

Camp Room And Tank

  • Camp

Contact Us

KOSUN MACHINERY CO., LTD.
Phone: +86 13379250593
           (WhatsApp/WeChat)
E-mail: office@adkosun.com
Add: D22, 4th Floor, Deyue Smart Valley, Fengcheng 10th Road, Xi 'an Economic & Technological Development Zone, Shaanxi Province, China

Index       Products       Services      About Us       Cases       News       Contact Us      Sitemap


Copyright 1992-2023 by KOSUN Group All rights reserved